110 kV line
Jessen-Prettin

Client: LTB Leitungsbau GmbH

End customer: Mitnetz


GVS's first contract, a 110 kV Mitnetz project, foundation, pre-assembly and mast erection.


Project key figures:
  • Construction period (weeks/year): 45/2018 - 26/2019

  • 52 masts founded in pile pipe

  • 5 mast slab foundations

  • 52 UT masts pre-assembled, positioned and aligned



Founding:
  • Concrete volume (m³): 332

  • Reinforcement (t): 36

  • Mass UT (t): 59


Steel construction:
  • Pre-assembly mass (t)

  • Mass of stock (t)