Our TOP projects

Successfully implemented projects.

Filtern nach filter

Europten, Alle

380-kV-Ltg. Dörpen/West-Niederrhein

Installation of 8 pylons for the 380 kV power line Dörpen/West–Niederrhein for EUROPTEN / Tennet.

Electron, Alle

380-kV-Ltg. Regierungsbezirksgrenze-Etzenricht, Los 3

Foundation of 38 masts in the East Bavarian Ring (Lot 3) with 5,000 m³ of concrete in BK6/BK7 soils.

LTB, Alle

380-kV-Ltg. Regierungsbezirksgrenze-Etzenricht, Los 4

Foundation of 18 masts in Ostbayerring (Lot 4) with 7,000 m³ of concrete in BK6/BK7 soils.

C-TEAM, Alle

380-kV-Ltg. Ulzburg-Lübeck West (OKL 1. BA), Los 4 + Los 5

Gründung von 23 Masten (OKL 1. BA) mit 68 Brextor-Bohrpfählen.

LTB, Alle

80-kV-Ltg. Ulzburg-Lübeck West (OKL 1. BA), Los 2 + Los 4

Installation of 48 masts with 136 Brextor bored piles under challenging soil and groundwater conditions.

Omexon, Alle

UA Merzen, BA1

Foundation in difficult soils and heavy substructures up to 35t.

EQOS, Alle

110-kV line Schwarzheide-Großräschen

BASF in Schwarzheide is getting a new substation.

LTB, Alle

380 kV line Usterath-Philippsburg (ULTRANET)

Pre-assembly and stacking of masts 165A and 49A.

C-TEAM, Alle

380 kV line Wahle-Mecklar D2

With very challenging locations and excavation pits up to 6.50 m deep, we have built on our success with lots D4 and D6.

LTB, Alle

380-kV line Röhrsdorf-Weide, Lot 2

Another major project for LTB with end customer 50 Hertz was realized within the planned construction period.

BOUYGUES, Alle

380 kV line Wahle-Mecklar C2 + C3

Our first contract for the French pipeline construction company BOUYGUES with the establishment of 18 locations.

LTB, Alle

380 kV line Wahle-Mecklar D3

For our long-standing and reliable customer LTB Leitungsbau GmbH, we have erected 13 masts and installed the lower sections on 16 masts.

LTB, Alle

DB BL 303
Gößnitz-Chemnitz, lot 1

The first railway line of GVS-Energie, a project of LTB-Leitungsbau GmbH on behalf of DB-Energie GmbH.

LTB, Alle

380-kV line
Bertikow-Neuenhagen, Lot 5

The 380-kV Bertikow-Neuenhagen line is GVS-Energie's largest project in 2021 to date.

LTB, Alle

110-kV line Görries-Wittenburg

110-kV line Görries-Wittenburg

LTB, Alle

380 kV line
Wahle-Mecklar, lot D4/D6

GVS-Energie's most challenging project in 2020.

EQOS, Alle

110-kV line Brachenfeld-Audorf, M93N, M94A

110-kV line Brachenfeld-Audorf, M93N, M94A

Europten, Alle

380 kV line
Ganderkessee-St. Hülfe

The new prequalification procedure at Tennet required for the stagnation was successfully completed on November 3, 2020.

Europten, Alle

110 kV line
Selbach-Wadern

Pre-assembly of 52 masts in difficult terrain in the beautiful Saarland for the client Europten and end customer Westnetz.

Electron, Alle

110 kV line
Großräschen-Schwarzheide

Our first project at home for our client Electron.

EQOS, Alle

380 kV line
Audorf-Flensburg, Lot 2

GVS's first 380-kV contract, a TenneT project with rammed pipe foundations, pre-assembly and piling.

LTB, Alle

380 kV line
Stendal/West-Wolmirstedt

A long-term 380-kV 50 Hz large-scale contract in the Wolmirstedt area, large foundation volume.

LTB, Alle

110 kV line
Jessen-Prettin

GVS's first contract, a 110 kV Mitnetz project, foundation, pre-assembly and mast erection.

C-TEAM, Alle

100 kV line
Hagenwerder-Schönbrunn

27 mast replacement construction with slab foundation in the network of Enso Energie Sachsen Ost AG with the client C-Team.

C-TEAM, Alle

380 kV line
Grabowhöfe-Güstrow

6 masts replacement new building at the same location with slab foundation over the existing foundation.

LTB, Alle

110 kV line
Vieselbach-Sömmerda

Pre-assembly of 18 masts in the TEN network with client LTB Leitungsbau GmbH.

LTB, Alle

110 kV line
Thyrow-Groß Köris

Slab foundation foundation work and pre-assembly on a 110 kV Edis line in the Thyrow area.

LTB, Alle

110 kV line
Görries-Hagenow

GVS-Energie is pleased with the rammed pipe and slab foundations as well as pre-assemblies at LTB.

Europten, Alle

380 kV line.
Ragow-Preilack

First project for the Europeans: Pre-assembly on the 380 kV Ragow-Preilack line at pylon 110 in March 2019.

EQOS, Alle

380-kV line Stade-Landesbergen PFA 5

34 masts integration of bored piles