110 kV line
Thyrow-Groß Köris

Client: LTB Leitungsbau GmbH

End customer: Edis


Slab foundation foundation work and pre-assembly on a 110 kV Edis line in the Thyrow area.


Project key figures:
  • Construction period (week/year): 06/2019 - 16/2019

  • 21 masts founded with slab foundations

  • 21 masts pre-assembled



Founding:
  • Concrete volume (m³): 593

  • Reinforcement (t): 47

  • Mass UT (t): 25


Steel construction:
  • Pre-assembly mass (t): 200

  • Mass of stocking (t): 0