110 kV line
Thyrow-Groß Köris

Client: LTB Leitungsbau GmbH
End customer: Edis
Slab foundation foundation work and pre-assembly on a 110 kV Edis line in the Thyrow area.
Project key figures:
Construction period (week/year): 06/2019 - 16/2019
21 masts founded with slab foundations
21 masts pre-assembled
Founding:
Concrete volume (m³): 593
Reinforcement (t): 47
Mass UT (t): 25
Steel construction:
Pre-assembly mass (t): 200
Mass of stocking (t): 0