380-kV-Ltg. Dörpen/West-Niederrhein

Client: Europten Transmission Germany GmbH

End customer: Tennet TSO GmbH


Erection of eight 380 kV pylons for EUROPTEN GmbH. The new prequalification procedure required for the erection at TenneT was successfully completed on July 23, 2025.

 

Project key figures:

Construction period: June 2025 to August 2025

Construction period (weeks/year): 25/2020 - 50/2020

  • 8 masts pre-assembled

  • 8 masts stacked


Steel construction
  • Mass pre-assembled (t): 495

  • Mass Stocken (t): 495