380-kV-Ltg. Regierungsbezirksgrenze-Etzenricht, Los 3

Client: Electron Leitungsbau GmbH

End customer: Tennet


Foundation for Electron of 36 masts in the 3rd construction phase of the East Bavarian Ring, Lot 4 in hard BK6/BK7 soils and partly difficult terrain and demanding end customer.

 

Project key figures:

Construction period: November 2024 to December 2025

38 new masts

  • 38 masts, slab foundations with a total concrete volume of 7,000m³



Founding
  • Concrete volume (m³) 5,000

  • Reinforcement (t) 520

  • UT places (t) 30