380-kV-Ltg. Regierungsbezirksgrenze-Etzenricht, Los 4

Client: LTB Leitungsbau GmbH
End customer: Tennet
Foundation for LTB of 18 masts in the 3rd construction phase of the East Bavarian Ring, Lot 4 in hard BK6/BK7 soils and partly difficult terrain and demanding end customer.
Project key figures:
Construction period: November 2024 to December 2025
18 new masts
18 masts, slab foundations with a total concrete volume of 7,000m³
Founding:
Concrete volume (m³) 7,000
Reinforcement (t) 650
UT places (t) 409