380-kV-Ltg. Regierungsbezirksgrenze-Etzenricht, Los 4

Client: LTB Leitungsbau GmbH

End customer: Tennet


 

Foundation for LTB of 18 masts in the 3rd construction phase of the East Bavarian Ring, Lot 4 in hard BK6/BK7 soils and partly difficult terrain and demanding end customer.

 

Project key figures:

Construction period: November 2024 to December 2025

18 new masts

  • 18 masts, slab foundations with a total concrete volume of 7,000m³



Founding:
  • Concrete volume (m³) 7,000

  • Reinforcement (t) 650

  • UT places (t) 409