380-kV-Ltg. Ulzburg-Lübeck West (OKL 1. BA), Los 4 + Los 5

380 kV line Ulzburg-Lübeck West (OKL 1st construction phase), Lot 4 + Lot 5


Client: Cteam Consulting und Anlagenbau GmbH

End customer: Tennet TSO GmbH


Foundation work for cteam of 23 pylons in the first construction phase of the East Coast power line in challenging soils with high groundwater levels and demanding end customers. Second major project for one of our three Brextors at cteam.

 

Project key figures:

Construction period 04/2023 to 04/2025

23 new masts

  • 6 masts, slab foundations with a total concrete volume of 2,900m³

  • 17 masts, integration of bored pile masts


Founding
  • Concrete volume (m³) 2,900

  • Reinforcement (t) 340

  • UT places (t) 250

  • Soil replacement (m³) 2,800

  • 68 milled bored piles using the Brextor system