380 kV line.
Ragow-Preilack

Client: Europten

End customer: 50 Hertz Transmission GmbH


First project for the Europeans: Pre-assembly on the 380 kV Ragow-Preilack line at pylon 110 in March 2019.


Project key figures:

Construction period (week/year): 03/2019

Mast M110 pre-assembled


Founding:
  • Concrete volume (m³): -

  • Reinforcement (t): -

  • Mass UT (t): -


Steel construction:
  • Pre-assembly mass (t): 26

  • Mass of stock (t): -