380 kV line.
Ragow-Preilack

Client: Europten
End customer: 50 Hertz Transmission GmbH
First project for the Europeans: Pre-assembly on the 380 kV Ragow-Preilack line at pylon 110 in March 2019.
Project key figures:
Construction period (week/year): 03/2019
Mast M110 pre-assembled
Founding:
Concrete volume (m³): -
Reinforcement (t): -
Mass UT (t): -
Steel construction:
Pre-assembly mass (t): 26
Mass of stock (t): -