380 kV line
Stendal/West-Wolmirstedt

Client: LTB Leitungsbau GmbH
End customer: 50 Hertz Transmission
A long-term 380-kV 50 Hz large-scale contract in the Wolmirstedt area, large foundation volume.
Project key figures:
Construction period (weeks/year): 24/2019 - 50/2019
26 masts founded with slab foundations
4 masts driven pile foundation
3 mast pre-assembly
Founding:
Concrete volume (m³): 3,461
Reinforcement (t): 277
Mass UT (t): 6
Steel construction:
Pre-assembly mass (t): 114
Stock mass (t): 56