380 kV line
Stendal/West-Wolmirstedt

Client: LTB Leitungsbau GmbH

End customer: 50 Hertz Transmission


A long-term 380-kV 50 Hz large-scale contract in the Wolmirstedt area, large foundation volume.


Project key figures:

  • Construction period (weeks/year): 24/2019 - 50/2019

  • 26 masts founded with slab foundations

  • 4 masts driven pile foundation

  • 3 mast pre-assembly



Founding:
  • Concrete volume (m³): 3,461

  • Reinforcement (t): 277

  • Mass UT (t): 6


Steel construction:
  • Pre-assembly mass (t): 114

  • Stock mass (t): 56