80-kV-Ltg. Ulzburg-Lübeck West (OKL 1. BA), Los 2 + Los 4

Client: LTB Leitungsbau GmbH

End customer: Tennet


 

Foundation work for LTB of 48 pylons in the first construction phase of the East Coast Line in challenging soils with high groundwater levels and demanding end customers. Second major project for one of our three Brextor towers at LTB.

 

Project key figures:

Construction period 04/2023 to 04/2025

48 new masts

  • 12 masts, embedding driven piles

  • 2 masts, slab foundations

  • 34 masts, integration of bored pile masts



Founding:
  • Concrete volume (m³) 1,400

  • Reinforcement 162.8t

  • UT places 521t

  • 136 milled bored piles using the Brextor system