380 kV line
Audorf-Flensburg, Lot 2

Client: EQOS-Energie Deutschland GmbH

End customer: Tennet TSO GmbH


GVS's first 380-kV contract, a TenneT project with rammed pipe foundations, pre-assembly and piling.


Project key figures:
  • Construction period (week/year): 01/2019 - 05/2020

  • 35 masts founded in pile-driving pipe35 masts UT pre-assembled, positioned and aligned



Founding:
  • Concrete volume (m³): 263

  • Reinforcement (t): 30

  • Mass UT (t): 350

Steel construction:
  • Pre-assembly mass (t): 120

  • Stock mass (t): 120