380 kV line
Audorf-Flensburg, Lot 2

Client: EQOS-Energie Deutschland GmbH
End customer: Tennet TSO GmbH
GVS's first 380-kV contract, a TenneT project with rammed pipe foundations, pre-assembly and piling.
Project key figures:
Construction period (week/year): 01/2019 - 05/2020
35 masts founded in pile-driving pipe35 masts UT pre-assembled, positioned and aligned
Founding:
Concrete volume (m³): 263
Reinforcement (t): 30
Mass UT (t): 350
Steel construction:
Pre-assembly mass (t): 120
Stock mass (t): 120