380 kV line
Ganderkessee-St. Hülfe

Client: Europten Transmission Germany GmbH

End customer: Tennet TSO GmbH


The new prequalification procedure at Tennet required for the stagnation was successfully completed on November 3, 2020.


Project key figures:

Construction period (weeks/year): 25/2020 - 50/2020

  • 15 masts pre-assembled

  • 12 masts stacked


Steel construction
  • Pre-assembly mass (t): 793

  • Stock mass (t): 313