top of page

100 kV line
Hagenwerder-Schönbrunn

110 kv line Hagenwerda-Schönbrunn, Uw-M59a

Client: Cteam Consulting and Plant Engineering GmbH

End customer: Enso


27 mast replacement construction with slab foundation in the network of Enso Energie Sachsen Ost AG with the client C-Team.


Project key figures:
  • Construction period (weeks/year): 37/2019 - 09/2020

  • Foundation of 27 masts (slab foundations)

  • Dismantling of 27 masts

  • Pre-assembly of 27 masts



Founding
  • Concrete volume (m³): 1,059.10

  • Reinforcement (t): 127.92

  • Mass UT (t): 35.88


Steel construction
  • Pre-assembly mass (t): 216.12

  • Stock mass (t): 195.60