380-kV line Röhrsdorf-Weide, Lot 2

380 kV line Usterath-Philippsburg (ULTRANET)

Client: LTB Leitungsbau GmbH

End customer: 50 Hertz Transmission GmbH


Another major project for LTB with end customer 50 Hertz was realized within the planned construction period.


Project key figures:

Construction period (week/year): 04/2023 - 10/2023

  • 20 masts new construction


Founding
  • Concrete volume (m³): 2,400.00

  • Reinforcement (t): 230.00

  • Mass UT (t): 99.00