top of page

110-kV line Schwarzheide-Großräschen

110-kV line Schwarzheide-Großräschen (BASF)

Client: EQOS Energie Deutschland GmbH

End customer: Mitnetz + BASF Schwarzheide


BASF is getting a new substation in Schwarzheide. For this purpose, three existing pylons were relocated and rebuilt on the BASF site. GVS Energie GmbH provided the foundation and pre-assembly services in-house. Concrete curing for XA3 concrete was carried out in-house on all three slabs.



Project key figures:

Construction period (week/year): 08/2023 to 10/2024

  • 3 mast replacement construction with XA3 post-treatment


Founding
  • Concrete volume (m³): 245

  • Reinforcement (t): 28

  • Mass UT (t): 13

  • Pre-assembly (t): 66


Dismantling 2 masts:
  • 18t scrap, 55m³ demolition concrete