top of page

380-kV line Stade-Landesbergen PFA 5

Client: EQOS-Energie Deutschland GmbH
End customer: Tennet TSO GmbH

Foundation in difficult soils, with a lot of groundwater, flood foundation heads and heavy bases up to 35t.


Project key figures:
  • 34 masts integration of bored piles

  • Execution period 03/23 to 06/24


Founding:

Concrete volume: 971m³

Reinforcement: 89t

Mass UT: 419t

bottom of page