top of page
380-kV line Stade-Landesbergen PFA 5

Client: EQOS-Energie Deutschland GmbH
End customer: Tennet TSO GmbH
Foundation in difficult soils, with a lot of groundwater, flood foundation heads and heavy bases up to 35t.
Project key figures:
34 masts integration of bored piles
Execution period 03/23 to 06/24
Founding:
Concrete volume: 971m³
Reinforcement: 89t
Mass UT: 419t

bottom of page


