UA Merzen, BA1

UA Merzen, BA1

Client: Omexon

End customer: Amprion


Foundations in difficult soils and heavy substructures weighing up to 35 tons. Together with Spezialtiefbau Cottbus GmbH, GVS Energie GmbH constructed the foundations for 11 pylons in front of the Merzen power plant. Some of the XA3 concrete foundations required structural protection from the acidic and aggressive waters with a coating.

 

Project key figures:

Construction period (week/year): 08/2023 to 10/2024

  • 11 masts replacement construction with XA3 post-treatment


Founding
  • Concrete volume (m³): 1,700

  • Reinforcement (t): 240

  • Mass UT (t): 180