UA Merzen, BA1

UA Merzen, BA1
Client: Omexon
End customer: Amprion
Foundations in difficult soils and heavy substructures weighing up to 35 tons. Together with Spezialtiefbau Cottbus GmbH, GVS Energie GmbH constructed the foundations for 11 pylons in front of the Merzen power plant. Some of the XA3 concrete foundations required structural protection from the acidic and aggressive waters with a coating.
Project key figures:
Construction period (week/year): 08/2023 to 10/2024
11 masts replacement construction with XA3 post-treatment
Founding
Concrete volume (m³): 1,700
Reinforcement (t): 240
Mass UT (t): 180