110 kV line
Vieselbach-Sömmerda

Client: LTB Leitungsbau GmbH

End customer: Thuringian Energy Networks


Pre-assembly of 18 masts in the TEN network with client LTB Leitungsbau GmbH.


Project key figures:
  • Construction period (week/year): 04/2020 - 09/2020

  • 21 masts pre-assembly


Steel construction
  • Pre-assembly mass (t): 228.97