110 kV line
Vieselbach-Sömmerda

Client: LTB Leitungsbau GmbH
End customer: Thuringian Energy Networks
Pre-assembly of 18 masts in the TEN network with client LTB Leitungsbau GmbH.
Project key figures:
Construction period (week/year): 04/2020 - 09/2020
21 masts pre-assembly
Steel construction
Pre-assembly mass (t): 228.97